- Scope of work: Transport 82 packages out of gauge from Nhon Trach, Dong Nai to Phu My Port, Ba Ria Vung Tau.
- Place of receive: Posco E&C Factory, Nhon Trach 1 Industrial Zone, Nhon Trach District, Dong Nai, Vietnam.
- Port of loading: Thi Vai General Port, Phu My, Ba Ria Vung Tau.
- Port of discharge: Umm Qasr, Iraq.
- Commodity: 82 Packages.
- Volume: 2047 CBM.
- Weight: 223884 kg.
Related Post:
Heineken ba ria vung tau factory project
Saigontrans transported 2 super-heavy tanks for the Heineken Ba Ria, Vung Tau brewery project. Commodity [...]
Jul
List of wind projects in Vietnam
Vietnam In recent years, the speed of construction of wind power projects is quite impressive. [...]
Jun
oversized cargoes for Kon Tum Upstream Hydropower
Saigontrans transports oversized project cargo, for domestic and international projects.In the past year, we have [...]
Jun
Transported transformers for Hiep Thanh, Tra Vinh project
Saigontrans transported 2 super-long-weight transformers for Hiep Thanh wind power project, Tra Vinh. Modes of transport: [...]
Jun
ShinHeung Dong Nai factory project
Saigontrans specializes in transporting oversized equipment and heavy industrial machinery. Recently, Saigontrans has completed the [...]
Jun
Wind power plant in the Thuận Bắc district of Vietnam’s Ninh Thuận province
Saigontrans‘s heavy lift and transport wind power plant in the Thuận Bắc district of Vietnam’s [...]
Jun